We’re still putting the finishing touches on our new site. Thank you for your patience while we build something worth the wait.
A value-driven hotel redesign that adds guest rooms, transforms the basement into smart parking, and upgrades every system throughout.
A strategic, value-driven redesign was undertaken to elevate the hotel's investment performance, capacity, and operational efficiency through the addition of new floors and full basement transformation. The architectural and structural reconfiguration increased guest room count while maintaining strict compliance with hospitality standards and regulatory requirements.
The basement was converted into a high-efficiency smart parking facility, maximising capacity and streamlining vehicle circulation — integrating digital guidance, occupancy sensors, and intelligent wayfinding to reduce search time and enhance guest convenience.
enhancements included smart parking with integrated occupancy detection, code-compliant mechanical ventilation, upgraded fire protection systems, and detailed structural modifications fully coordinated across all MEP disciplines.
Adding floors to an existing hotel while transforming the basement into smart parking requires every engineering discipline to work as one. The rooms above and the parking below are the same structural problem.